Hot Water PERT II Pipe Installation In Jilin

Hot Water Supply Company: Jilin Hot Water Supply Group

Location: Jilin City Jilin Province

Construction Time: June-Oct. 2015

Hot Water Supply Area: 450000㎡
Designed Temp.: 70℃

Designed Operation Pressure: 0.4-0.8Mpa
Installation Length: 16000m

This project is for old building hot water piping replacement installation. The whole project adopts PERT II pipes from dn63mm to dn225mm.

 

Related Project