Hot Water PERT II Pipe Installation In Changchun

Hot Water Supply Company: Changchun Hot Water Supply Group

Location: Changchun City Jilin Province

Construction Time: Aug.-Oct. 2015

Hot Water Supply Area: 120000㎡
Designed Temp.: 70℃

Designed Operation Pressure: 0.6Mpa
Installation Length: 5000m

This project is for old building hot water piping replacement installation, in total 33 buildings. All installation in dicth. The whole project adopts PERT II pipes from dn63mm to dn160mm.

 

 

Related Project