Hot Water PERT II Pipe Earliest Trial Project in Jilin

Hot Water Supply Company: Jilin ShengyuanThermal Power Company

Location: Jilin City Jilin Province

Construction Time: Oct. 2012

Hot Water Supply Area: 5000㎡
Designed Temp.: 65℃

Designed Operation Pressure: 0.4Mpa
Installation Length: 200m

This is the earliest trial project is for new building hot water PERT II piping installation. The whole project adopts PERT II pipes from dn90mm to dn200mm. Up to 2015, three winters passed, the feedback on performance is very good.

 